Method: Runoff Reduction Method (RRM) w/ optional TRM     TSS Reduction Method (TRM) Only

Step 1 Layout proposed site and divide into sub-areas each of a specific land use type. Step 2: Treat impervious areas through the use of sheet flow. Step 3: Treat primarily impervious areas with structural GIPs, use 3a alone or in combination with 3b for structural GIPs in Series. TRM TRM
Subareas Step 1 Proposed Land Use Step 2 Intrinsic GIPs Step 3a Structural GIPs Step 3b Structural GIPs in Series TRM 1 TRM 2 Tv Captured & Remaining TRM 1 TRM 2 %TSS
Subarea Description Code Acres Rv Code Eff Rv Code Treat Vol Eff Rv Code Treat Vol Eff Rv TRM Code TSS Credit % TRM Code TSS Credit % Tv Required Total TSS Credit % Tv Required Tv Captured 3a Tv Captured 3b Tv Remaining TRM Code TSS Credit % TRM Code TSS Credit % Total TSS Credit %
1
0.00    
% Removal (Goal is 82%): % Removal: % Removal: % Removal: % Removal: % Removal: